Steel Products
With the highest modern steel technology
We are constantly achieving the highest positive results in the steel industry, and we are moving forward on a steady path and approach whose primary goal is manufacturing history.
A LEADING COMPANY IN THE FIELD OF INDUSTRY AND MANUFACTURING
Our Vision
El Safwa Steel Company promotes building the future
The vision of Al Safwa Steel Company is designed to go beyond the idea of manufacturing high quality steel products! So that it simulates the Egyptian vision and implements a global and local strategic direction in which we use our industrial expertise for the benefit of our customers to build confidence and create sustainable added value for the future; Provide them with reliable guidance and high quality products to live up to their aspirations
![](https://elsafwasteel.com/wp-content/uploads/2023/08/UNIQE-STORE-2-e1693032100202.png)
demonstration video
SERVICES AND PRODUCTS WE PROVIDE WITH EXCELLENCE
High quality manufacturing services for integrated projects.
We are close to you
And activists to export internationally
![](https://elsafwasteel.com/wp-content/uploads/2024/05/إضافة-عنوان-فرعي.png)
Join our team
![](https://elsafwasteel.com/wp-content/uploads/2023/08/Capture-3.png)
![WhatsApp Image 2023-08-26 at 14.11.06](https://elsafwasteel.com/wp-content/uploads/2023/08/WhatsApp-Image-2023-08-26-at-14.11.06-300x294.jpg)
The express train project in Bahtim
The high-speed electric train stations of the Green Line consist of 22/24 stations (12 regional stations and 12 high-speed train stations), provided that the design speed of the project is 250 km/h, the speed of regional electric trains is 160 km/h, and the operational speed of high-speed electric trains is 230 km/h. And the speed of electric cargo tractors is 120 km/h.
![202110300218401840](https://elsafwasteel.com/wp-content/uploads/2023/08/202110300218401840-300x150.jpg)
And supplying iron doors, corners and beams for Wadi El-Natrun Prison
Supply Belt-up One of them is located at the industrial entrance to Sadat City on kilometer 92 on the desert road. Its construction was completed in September 1994. Inmates were transferred to it from Tora Istikbal Prison and Abi Zaabal Al-Sinai. It has three wards with a total of 54 cells.